The Long Lead-Acid Battery 12V 12AH is a high-performance, maintenance-free, and rechargeable sealed lead-acid (SLA) battery designed for reliable power supply in various applications. It is built with Absorbent Glass Mat (AGM) technology, ensuring efficient energy storage, deep discharge recovery, and long service life. This battery is commonly used in backup power systems, emergency lighting, UPS (Uninterruptible Power Supply), alarm systems, mobility scooters, and solar power storage.
Long Lead-acid battery 12V 12AH
Long service life with deep discharge recovery capability
Low self-discharge rate (~3% per month at 25°C)
High energy density and stable performance
Vibration and shock resistant
Category Computer
Policies
- 🚚 Delivery Policy:
Fast and reliable shipping within 3–7 business days in Pakistan. Bulk or custom orders may take longer. Tracking details provided after dispatch.
- 🔄 Return Policy:
We accept returns within 7 days of delivery for defective or incorrect items. Items must be in original condition.
- 🛡️ Warranty:
This product comes with a 1 Year Warranty warranty.
Rated 0 out of 5
0 reviews
Rated 5 out of 5
0
Rated 4 out of 5
0
Rated 3 out of 5
0
Rated 2 out of 5
0
Rated 1 out of 5
0
Be the first to review “Long Lead-acid battery 12V 12AH” Cancel reply

Reviews
Clear filtersThere are no reviews yet.